Superior Terminal Expansion Project Phase II

We added nearly three million barrels of new tank capacity to Enbridge’s Superior terminal: new piping, new pumping, and a full electrical rebuild. At peak, we had more than 350 people on site, including crews from our own union hall here in Duluth.

Line 41 Mississippi River HDD

Replacing a pipeline under a major river takes more than a trench. We drilled 4,400 feet beneath the Mississippi River bed and installed nearly 7,000 feet of new pipe for Enbridge, on a project worth more than $150 million.

Bison XP – Glen Ullin CS

We rebuilt TC Energy’s Glen Ullin compressor station from the inside out. Two new turbines, four gas coolers, and all-new compressor buildings, built to raise both capacity and reliability.